Hi All,
I would like to compare the Attribute, Analytic and calculation view data using query in SAP HANA ? For instance, if the Calculation view fetches data from combination of Attribute and Analytic view. I want to compare Attribute, Analytic query result against the Calculation view result. is it possible ?
SAP Landscap is development server, quality server, production server.
how to identified payment and transaction levels in with holding taxs
The error that I am getting is the following: Error: Error in method call References: No such instance: Error: Error in method call References: No such instance: sld/active:SAP_LogicalALESystem.CreationClassName="SAP_LogicalALESystem",Name=
with
An exception of class CX_WBEM_CIM_ERR occurred
Hi Derek,
What is the SP level for your Solution Manager system ?
Regards,
Manish
Hi All,
We have different systems in our project like development, quality and production. We also have solman as a separate system. My question is what is difference between these(development, quality, production) systems and solman and why do we have separate system for solman?
Apologies if it sounds very basic.
Thanks and Regards,
Vineet
well this is really basic:)
You need 3 systems to follow the best practice for SAP environment and all systems have a different role to play.
Dev - for building new objects like programs, new functions etc ..
QA - for testing, UAT etc..
Prod - for day-to-day business
May be this helps you to understand usage of SolMan system:
https://help.sap.com/saphelp_sm71_sp01/helpdata/en/45/59dccac2091deae10000000a155369/content.htm
Hello,
Solution manager system is separate solution e.g. ERP is separate solution than CRM solution.
You can use solution manager system for lot of tasks like Technical monitoring, Business Process monitoring, service desk, Charm, download of support package stacks and EWA reports etc.
Thanks,
Sunny
what is the differ between orgnisational level and authorization object?????????
Hi Vineet
SAP Solution Manager is product from SAP which offers multiple capablities for the entire lifecycle management
even for Solution Manager you have
Dev QA and Production so that you can build test and deploy the functionalities for it like the way you do it in ERP or SCM or CRM etc
you can find lot of good stuff here
Solution Manager 7.1 - Solution Manager - SCN Wiki
In addition It is a central system connected to all the upgrade can happen via solution manager as Mopz is mandatory which is the feature of solman to do the upgrade for erp scm crm etc
hope this useful for you and clarifies the doubt
Regards
Prakhar
Org. level can be any organizational unit in your company like company code, controlling area, plant , business area etc...
Authorization object - http://scn.sap.com/docs/DOC-17023
thank you
hi.......
what is the difference between su24&su25? how it is used?
Hi All,
I have recently joined in SAP-HCM projecet as a fresher. Could anyone provide me the documents so that it will be really helpful for me related to SAP HCM.
Many thanks in advance.
Regards,
Dinesh Krishnaraj
Hello Dinesh,
This forum is dedicated to the product SAP Landscape Transformation which helps with any System Landscape Optimization requirements.
Can you please post your question on the SAP HCM forum on SCN.
Thanks and Regards,
Tanu
Dear All Expert,
Please help and guide us to achieve the subjected goals. What are the prerequisites and risk involved to complete this project successfully.
Please provide us necessary steps and activities those are required to achieve the requirement.
Information about the business
Currently business has SAP ECC6 with EHP4 and have 3 landscapes with same company codes (as below table) for different landscapes.
Company codes are the same for landscapes but functionalities of all landscapes are different with each other & 2000 company required to transport same as it is.
All business have different configuration for their process MRP, COA, Notification, Maintenance production Order, release strategy and purchasing.
Requirement three Landscapes merge into single landscape with process data migration.
Modules are FICO, MM, QM, PP, PM, HR, SD.
One BW system have for three landscapes.
Landscapes | Company Code | Plant | Business Area |
ABC | 1000 | 1000 | 1000 |
ABC | 1000 | 2000, 3000, 4000, 5000 | 2000, 3000, 4000, 5000 |
ABC | 1000 | 6000 - 6500 | 6000 - 6500 |
DEF | 1000 | 7000 | 7000 |
DEF | 2000 | 8000 | 8000 |
XYZ | 1000 | 9000 | 9000 |
I will be grateful in this regard
Regards/ Nasir Ramzan
Dear Colleagues,
When creating a CC Deletion Project I'm finding some errors in Landscape definition.
When checking Landscape Status I got the message "Settings for RFC destination MBT_SLM_SLM_001_14_0002_MBT have been changed."
I can not move forward, since Analysis or package can not be created.
See that there is no error on Landscape definition.
Have you ever saw this problem?
SLT is installed with SP6, DMIS is also on SP6 in my Solution Manager. ECC system has DMIS installed on SP6 level.
With best regards,
Flavio Batista
Netweaver Consultant
SAP Notes where implemented with no success.
1964603 - System Landscape / RFC Management ending in error status due to temporary connectivity issues
1978104 - Connection state N still checked
When going to project status and click on Not started I got the error and Dump.
ERROR
500 SAP Internal Server Error
ERROR: Exception condition "COMMUNICATION_FAILURE" raised. (termination: RABAX_STATE)
DUMP
RAISE_EXCEPTION Program SAPLCNV_MBT_RFC_700
Short text
Exception condition "COMMUNICATION_FAILURE" raised.
Key words
"RAISE_EXCEPTION" " "
"SAPLCNV_MBT_RFC_700" or "LCNV_MBT_RFC_700U04"
"CNV_MBT_RFC_700_CHECK_LS"